E-Tender for Electrical works for (a) Shifting of the existing 1X250 kVA DTR to Pump house near NT qtr. side, (b) The HT (11 kV) power line to be routed along the quarter road side with errection of new GI poles from the 33/11 KV Substation to 250 KVA DTR proposed to be shifted to NT lake side, (c) SITC of 11 KV covered conductor for location with dense forest and bamboo bushes, AUS